L&T offers all critical equipment and systems for oil & gas projects. Having successfully executed orders for large tubular reactors (1500 MT), L&T is qualified for manufacturing of futuristic gas-to-liquid reactors for the oil & gas sector, in addition to traditional products such as test and production separators (separate or skid-mounted).
Heavy wall CS / SS Pressure Vessels & Large Columns supplied for LNG Liquefaction (export) Terminals across the world.
Total No.:Â Over 75
Processes:Â ConocoPhillips, AP SplitMR, Shell
Materials:Â CS & SS
Max. Thickness: CS – Up to 150 Thickness, SS – Up to 135 Thickness
Max. Unit Weight: 1200 MT
Waste heat boiler supplied to global clients such as Saudi Aramco Shedgum Gas Project through Black & Veatch Pritchard, U.S.A in 1999.
Waste Heat Recovery systems supplied for various licensors with thermal as well as mechanical guarantees.
No. supplied:Ìý15
Dimensions:Â 35 m x 6.5 m x 6.5 m
Weight:Â 2700 MT WHB package Supplied to JGC for Bazan Project
Material: LAS, CS
Heat exchangers are supplied with SS & Incoloy materials for various onshore gas development projects.Among other large equipment, we have supplied large vessels (7.3 m diameter, 200 MT) for RasLaffan LNG Project supplied to JGC, Japan.
No. supplied:Â Over 10
Dimensions:Â 7.5 m x 2.5 m x 2.5 m
Weight:Â 25 to 250 MT
Material: SS, Inconel
We supply HP Separators to global clients including, one weighing 200 MT with 122 mm thickness (SA 242 Type 304) supplied to Petronas, Malaysia for LNG Train-9.
Supplied to Saudi Aramco Shedgum Gas Project through Black & Veatch Pritchard, U.S.A in 1999.
Dimensions:Â 3700 mm diameter x 99 mm thickness x 18288
Weight:Â 220 MT
Material: SA 516-70
90mm-thick Stainless steel column for Kellogg JV / Woodside LNG Project in Australia.
Dimensions:Â Diameter 8.5 m / L: 103 m (Max.)
Material: SS and CS + SS Clad